ANTALYA AKSA ENERGY POWER PLANT
Project Name
Location
Turkey
Date
2010
Duration
3 Months
Scope
3000 M3 RAW Water Tank Engineering.
Fabrication.
Erection.
Service
Fabrication / Installation
SAMSUN AKSA ENERGY POWER PLANT
Project Name
Location
Turkey
Date
2010
Duration
4 Months
Scope
3000 M3 RAW Water Tank Engineering
LO Service Tank
20 m3 LO Service Tank
Service
Fabrication / Installation