Deha Tech has founded by two close friends Mr Berk Dal and Mr. Hakan Yıldırım. The Company motto ''Genius Solutions'' is to meet tomorrow's market from now on with a tailored solutions.
Company is growing
Deha Tech, EPC as a basis for Rotary Kiln in Turkey has completed the installation and commissioning process. Extractive metallurgy process has been designed according to the raw material stored.
Energy from Waste
A good solution for Plymouth, MVV Environment c/o Devonport EfW CHP Facility Devon. Saving resources and reducing the carbon footprint of Plymouth Energy from Waste
We aim to be among the leading companies in the future.
Storage Tanks and Fire Fighting System for 750MW Nainawa Power Plant in Iraq has been successfully completed, we believe in long lasting our business relationships with our hard working experienced team
Expansion of combined-cycle power plant
Expansion of its experiences by CCPP in Turkey 900MW Erzin and 1200MW Hamitabat projects locally and 1574 MW Mary 3 in Turkmenistan international.
We are in renewable energy sector
Expansion of its activities in renewable energy sector. Energy from Waste, Biomass, Biogas, Wind, Solar and Geothermal Energy
EfW in Istanbul
DH manufactured and delivered main components-feed hopper, bottom ash chute, boiler non-pressure parts, grate riddlings and silos- not only for Europa’s largest EfW plant in Istanbul also EfW in France, UK, Russia and Austria
Expanded production activities
Deha Tech has approximately expanded its production activities with two workshops in Gebze and Kartepe. It is 60 km from Istanbul. Three branches in Russia, Iraq and Bulgaria
The mission carried out by our professional engineers and technicians has been completed.
It increased its operations at the Waelz plants and expanded its business to the UK, France, Russia and Australia, and became the equipment supplier of the US ship loader manufacturer cement plant for Russia. Production extension with a total of 6 workshops